Integrated Fuel Management for the New Children’s Hospital, Dublin

Summary

The New Children’s Hospital, Dublin required a highly resilient fuel management system to support both standby power generation and heating infrastructure. Anglo Nordic supplied a complete fuel transfer, monitoring and conditioning solution designed to provide reliable fuel availability across critical hospital services.


Project Overview

  • Industry: Healthcare
  • Location: Dublin, Ireland
  • Application: Generator and Heating Fuel Management
  • Fuel: Gas Oil
  • Operation: Critical Healthcare Infrastructure

Project Requirements

  • Supply gas oil to emergency and standby generators.
  • Supply fuel to the hospital’s heating system.
  • Maintain continuous fuel availability.
  • Provide redundant control and communications.
  • Monitor storage and day tank levels.
  • Detect leaks and maintain fuel quality.
  • Automate fuel transfer and tank filling.

Equipment and Solution

Anglo Nordic supplied a complete fuel management system serving both the generator and burner fuel networks.

The installation was designed around two main storage tanks supplying separate generator and burner ring mains. Fuel transfer was provided by two RL 7 Duplex Fuel Pump Systems, delivering up to 5,300 l/h and providing duty/standby resilience.

Five generator day tanks were supplied via dedicated FP 90 Fuel Pumps with automated filling controlled by SMMR Level Switches and solenoid valves.

Fuel quality was maintained using twin SAFA Fuel Conditioning Systems, whilst tank monitoring was provided by EDM-40 Remote Level Gauges.

Centralised control was provided through Inpro CAG+ control cabinets operating on a fully redundant PLC architecture, incorporating dual PLCs with Modbus and TCP/IP communications for enhanced system resilience.

The completed installation delivered an integrated fuel management solution supporting both standby power generation and heating systems across the hospital campus.


Equipment Breakdown

RL 7 Duplex Fuel Pump Systems

  • Transfer capacity: 5,300 l/h
  • Duty/standby configuration
  • Supplies generator and burner ring mains

FP 90 Fuel Pumps

  • Transfer capacity: 900 l/h
  • Generator day tank filling
  • Automated fuel transfer

SAFA Fuel Polishing System

  • Continuous fuel polishing
  • Water and contaminant removal
  • Fuel quality management

SMMR Level Switches

  • High and low level control
  • Automated filling management
  • Pump and valve control

EDM-40 Remote Level Gauge and Control

  • Continuous tank level monitoring
  • Relay and analogue outputs
  • Centralised fuel management functions

CAG Fuel Monitoring Panel

  • Centralised system control
  • Pump and valve management
  • Redundant communications architecture

Outcome

The project delivered a fully integrated fuel management system providing reliable fuel transfer, automated tank management, fuel conditioning and leak detection for both generator and heating systems within a critical healthcare environment.


Equipment List


Get in touch today

From hospitals and healthcare facilities to standby power systems and critical infrastructure projects, Anglo Nordic delivers fuel management solutions designed to provide reliable fuel transfer, monitoring and conditioning when continuity of operation is essential.

Let's talk

If you’d like to discuss this article, or any of our solutions, please just get in touch using any of our contact methods.

Share This Post

More To Explore